2010年8月17日星期二

Further landslides yesterday Zhouqu(昨晚舟曲再发泥石流)

  舟曲再发泥石流
大雨导致塌方  313省道再次中断
Gansu Zhouqu newspaper (Reporter reporter Wang Keqin probationary fire Hing Choi) last night around 20:30, Zhouqu usher in "8 • 7" Flood debris flow after the first heavy rain. 22:00 start, heavy rain triggered landslides again, leading to Dangchang section of Provincial Highway 313 Zhouqu interrupted again. At 20:30 the promise of thunder rang Zhouqu County, lightning after another. In several minutes of intense lightning, the rain began to fall Zhouqu disaster. Night 21 pm, an armed police at a press center told reporters: "Just now, the driver returned, then the county seat east of the debris flow.", The "Newsweek" a reporter for Zhouqu to landslides between the two estuaries,blocked the road. The phone message is as follows: "Zhouqu to Dangchang road heavy rain, landslides, road blocked, vehicles can not."
  
This article has been published in today's China Economic Times, this is the original manuscript. Articles published in the following address: http://www.jjxww.com/html/show.aspx?id=173099&cid=113
本报甘肃舟曲讯(记者王克勤 见习记者火兴才)昨晚2030分左右,舟曲迎来“87”特大洪水泥石流灾害之后第一场大雨。22时开始,大雨再次引发泥石流,导致省道313舟曲至宕昌段再次中断。
昨晚2030许,舟曲县雷声大作,闪电接连不断。在数十分钟的密集电闪雷鸣之后,舟曲灾区开始降雨。晚21时许,在新闻中心的一位武警告诉记者:“刚才我们的司机跑回来了,县城东边又泥石流了。”之后,《新闻周刊》一记者因舟曲到两河口之间发生泥石流,被阻在路上。其手机信息如下:“舟曲至宕昌路段暴雨,发生泥石流,道路被堵,车辆无法通过。”

本文章已经发表在今天中国经济时报,此为原稿件。所发表文章地址如下:
作者;王克勤

没有评论:

发表评论